[1]Abel JF,Lee FT.Stress changes ahead of an advancing tunnel[J].Int J Rock Mech Min Sci Geomech Abstr,1973,10(6).
[2]Seki J,Noda K,Washizawa E,Suzuki T.Effect of bench length on stability of tunnel face.In Abdel-Salam ME,editor[C].Proceedings of the International Congress on Tunneling and Ground Conditions,Caris.Rotteradam:A.A.Balkema,1994.
[3]Martin CD.Seventeenth Canadian Geotechnical Colloquium:The effect of cohesion loss and stress path on brittle rock strength[J].Can Geotech J,1997,34(5).
[4]Martin CD,Read RS,Dzik EJ.Near-face cracking and strength around underground openings[C].In:Rossmanith H-P,editor.Proceedings of the Second International Conference on the Mechanics of Jointed and Faulted Rock,Vienna.Rotterdam:A.A.Balkema,1995.
[5]王春生,周翠英.梅河高度公路隧道稳定性数值模拟[J].中山大学学报(自然科学版),2005,44(1).
[6]周太全,华渊,连俊英,等.软弱围岩隧道施工全过程非线性有限元分析.岩土力学,2004,25(增刊).
[7]许月,杨文,张宏博.软质岩体中浅埋隧道开挖支护的数值模拟[J].土工基础,2004,18(4).
[8]胡庆安,夏永旭,王文正.双连拱隧道施工过程的三维数值模拟[J].长安大学学报(自然科学版),2005,25(1).
[9]徐林生,孙钧,蒋树屏.洋碰隧道开挖面空间效应的数值模拟研究[J].沿途工程界,2002,4(6).
[10]周小平,徐小敏.四角田隧道围岩稳定性三维有限元数值分析[J].重庆建筑大学学报,2006,28(1).