[1]Casas J R.A combined method for measuring cable forces:The Alamillo Cable-Stayed Bridge in Spain[J].Structural Engineering International,1994,4(4).
[2]Casas J R.Full Scale Dynamic Testing of the Alamillo Cable-Stayed Bridge in Seville (Spain)[J].Earthquake Engineering and Structural Dynamic,1995,24.
[3]Shao X D,Zhao H,Li L F,et.al.Design And Experimental Study of A Harp Shaped Single Span Cable-Stayed Bridge[J].ASCE's Journal of Bridge Engineering,2005,10(6).
[4]邵旭东,陈爱军,李立峰.长沙市洪山大桥的创新设计[J].中外公路,2005,25(2).
[5]邵旭东,李立峰,赵华,彭旺虎.长沙市洪山桥竖琴式斜拉桥的设计[J].湖南大学学报(自然科学版).2001,28(4).
[6]陈爱军.大跨无背索竖琴式斜拉桥合理结构型式研究[D].湖南大学土木工程学院,2005.